The order includes the 4.8 mmtpy sinter plant, the sinter cooler and the product handling system. The new plant will replace the existing sinter plant No. 3. It features a state-of-the art waste gas recirculation system, thus reducing environmental impact. The new plant is expected to be started-up in the fourth quarter of 2019.
The new sinter plant for JFE´s Fukuyama works, located in the East of Hiroshima Prefecture, will have a sintering area of 387 square meters. Supplying the sinter plant, sinter cooling and product handling system, Primetals Technologies will also be responsible for engineering and on-site supervision. JFE Steel will be in charge of erection, civil works and electrics and automation. The new sinter plant will be equipped with the latest waste gas recirculation technology to ensure a reduced environmental impact through the sinter process. Latest designs and developments for major equipment will be applied tailor-made as per JFE Steel’s requirements for this project (e.g.: water cooled star crusher). The main reasons for JFE Steel for awarding the order were the high technological standard of Primetals Technologies´ sinter plant solution as well as the international references in this field.
JFE Steel operates seven steel works in Japan and has a work force of more than 44.000 employees. The company was founded in 2003 and is based in Tokyo, Japan. JFE Steel Corporation manufactures and sells steel products and offers steel sheets, plates, shapes, electrical sheets, pipes and tubes, stainless products, steel bars and wire rods, and iron powders, as well as certain titanium products.
Computer-animated image of the new sinter plant from Primetals Technologies to be supplied to Japanese steel producer JFE Steel Co. (JFE Steel). The new plant will replace the existing sinter plant No. 3 in the Fukuyama works.