Turmec has reportedly designed, supplied, and installed an advanced MRF plant in Wiltshire to treat kerbside collected comingled recyclable materials picked from around 220,000 households across the region. The plant will have the capacity to process 20 tonnes per hour of dry mixed recyclables, ensuring a high-quality separation of recycled materials is achieved.
News ID: 9035 Publish Date : 2020/04/02