Hertwich Engineering

Tags - Hertwich Engineering
Eurometal S.A., a company of the Eko-Świat group, has placed an order with Hertwich Engineering for the supply of an Ecomelt-PR100 multi-chamber melting furnace for the expansion of its aluminium casthouse in Klomnice, Poland. The plant, with a capacity of 30.000 tons per year, is scheduled to start operation in spring 2021. Hertwich Engineering , based in Austria, is a company of SMS group.
News ID: 8958    Publish Date : 2020/03/06

Cromodora Wheels SPA has installed a chip recycling furnace for wheel production in Ghedi, Italy. The furnace, with a capacity of 10,000 tons per year, was successfully supplied and commissioned by Hertwich Engineering , a company of SMS group.
News ID: 8364    Publish Date : 2020/01/22

Constellium Extrusions Dĕčín s.r.o., Czech Republic, has placed an order with Hertwich Engineering , a company of SMS group, for a further continuous homogenizing plant including a helical ultrasonic testing station and billet saw for aluminum extrusion billets.
News ID: 2077    Publish Date : 2018/04/14

At the turn of the year, Emirates Global Aluminium (EGA), Jebel Ali, UAE, successfully commissioned the fifth Hertwich batch furnace plant for the heat treatment of extrusion billets at the Jebel Ali plant.
News ID: 2016    Publish Date : 2018/03/15

The Spanish company Exlabesa Extrusion Padron SL has ordered a continuous homogenizing furnace with air cooling station, long billet stacker, billet saw, semi-automatic strapping and automatic weighing station from Hertwich Engineering , a company of SMS group, for its extrusion plant in A Coruña. The plant is scheduled to start production at the end of 2018.
News ID: 2004    Publish Date : 2018/03/10

The long-standing aluminum rolling mill in Amorebieta, Spain, which has been operating under the name Aludium since 2015, has ordered an Ecomelt-PS275 multi chamber melting furnace with preheating shaft for clean and contaminated scrap from Hertwich Engineering , an SMS group company.
News ID: 1935    Publish Date : 2018/02/13

Emirates Global Aluminium (EGA) has placed an order for the supply of an additional batch homogenizing furnace for the heat treatment of billets with Hertwich Engineering , a company of the SMS group. Including this new unit, which will go into operation at the end of 2017, a total of five batch furnaces of this type will be operating at EGA’s Jebel Ali plant and two at EGA’s Al Taweelah smelter.
News ID: 1125    Publish Date : 2017/04/15

The plant is designed for a capacity of 40,000 tons per year and shall be commissioned in September 2017.
News ID: 856    Publish Date : 2017/01/13

Hertwich Engineering supplies on turnkey basis
News ID: 364    Publish Date : 2016/06/10